The enablement platform for network operators, suppliers and solution providers
The German electricity market is facing a structural turning point:
Smart metering systems, §14a EnWG, controllable consumption devices, the use of flexibility and new tariff and supply concepts are increasing complexity – operationally, regulatory and organizationally.
neugemacht makes this change manageable.
At eWorld energy & water 2026, we will show how grid operators, suppliers and solution providers can clearly separate their different roles – and at the same time work together efficiently and securely.
One platform – clear roles – consistent processes
is the neutral enablement platform that:
- provides metering point operators with stable, scalable and integrated processes
-
Enables network operators to ensure stable, auditable operation of iMSys, CLS and §14a processes
-
Suppliers the basis for dynamic tariffs, flexibility and value-added products
-
national solution providers a standardized, scalable connection to regional market structures
We do not replace any market role – we orchestrate processes, partners and operations end-to-end.
Our focus at eWorld 2026
-
Standardization instead of project IT
Reusable MSB, CLS and Flex processes across all roles -
End-to-end responsibility as a service
From integration to operation to verification – SLA-capable and audit-proof -
ZONOS-based platform with integrated partner solutions
Multi-GWA, multi-CLS and multi-partner capable -
Enablement for municipal utilities and solution providers
National scaling meets regional operational reliability
Who is it made for?
-
Municipal utilities & grid operators
-
iMSys & §14a readiness with sovereign, local IT
-
Control, transparency and regulatory security
-
-
Suppliers & Distribution
-
Reliable measurement and control processes as the basis for new products
-
Faster time-to-market for flexibility use cases
-
-
Solution provider (PV, storage, EV, heat pump, energy-as-a-service)
-
A platform for the German electricity market
-
Standardized connection instead of individual regional solutions
-
Why redone?
Because the future of the electricity market will not fail because of technology, but because of:
-
Processes
-
Operation
-
Integration
-
Scaling
neugemacht combines national innovation speed with regional operational reliability – and makes the electricity market operationally scalable.
Meet us in hall 2 at stand 2A117 and make an appointment with us at >> Contact